KUALA LUMPUR: THE Light Rail Transit Line 3 (LRT3) from Bandar Utama to Johan Setia in Klang will begin operations on Sept 30.
IMPOSING congestion charges could reduce traffic by up to 20 per cent in Kuala Lumpur, said Minister in the Prime Minister’s Department (Federal Territories) Dr Zaliha Mustafa.